•Operation indicates if you want to update only the rate used or to switch to a different code also.
•Existing Charge/Cost Code identifies the one that is currently used.
•New Charge/Cost Code applies only if you are changing the code and identifies the one to be used. You should also assign this to the relevant resource if you want to use it for future timesheets.
•New Rate shows the existing hourly rate, which will be the one to use if it has been updated to the record. However, you can override it to apply a different rate.
•Change Timesheets Between/To will cause all timesheets dated within this period to be updated to the new rate and, where applicable, the code also.
•Only Updating determines the types of timesheet to be updated.