All the charge rates and descriptions for the project are listed, showing the normal hourly rate for each one and the currency for the rate. If:
•a different rate is to be applied to any of these codes for this project, enter the required rate into the ‘Adjusted Rate’ column; this will be used instead of the normal rate whenever any time is booked to the project with the same charge code
•a single rate is to apply for all time booked to the project, check Override Resource Charge Code and then specify the Charge Code to be used for all resources rather than their own rates; in this case, the Resource Override sub-tab does not apply.
NOTE: |